Hall for processing milk
Location: Topraisar, jud. Constanta
Investor: Elda Mec S.R.L.
EU funded projectDestination: milk processing hall
Total built area (P): 625 sqm.
Main structure: galvanized steel profiles, cold-formed, europrofile, combined with high-strength bolts.
Panels: tristrat panels, foam and sides in galvanized and painted (25 µm Polyester).
MeCAD contribution: delivery kit superstructure materials (resistance structure, panels, accessories sheet, assembly accessories); structure and panels design.